Company Case About Implementing Off-Grid Power Reliability for a Remote Australian Dairy Farm
Location: Tamborine Mountain, Queensland, Australia
Timeframe: March 2023 – Present
Protagonist: James Wilson, 52-year-old dairy farmer
James Wilson’s 50-hectare dairy farm in Tamborine Mountain faced chronic power instability. Grid outages (3–5 weekly) damaged milking equipment and spoiled refrigeration stocks. Diesel generators proved costly (AU$0.42/kWh) and unsustainable. With abundant sunlight but harsh environmental conditions—high humidity, dust storms, and temperatures ranging from 0°C to 45°C—James sought a resilient solar hybrid solution.
In April 2023, James deployed four M6200-48PL inverters (6.2KW each) in parallel, creating a 24.8KW 3-phase system. Key configurations included:
By November 2023, James confirmed: