Latest company case aboutPower Continuity Solution for Small Textile Workshop in India

Timeframe: April 2024 - Ongoing
Location: Surat, Gujarat, India (Industrial Zone)
End-User: Patel Textile Workshop (Family-owned business with 8 power looms)

Operational Challenges

 

 

  1. Grid Instability: 4-8 hour daily outages during monsoon season (June-Sept)

  2. Voltage Fluctuations: 160-260V swings damaging motor controllers

  3. Diesel Dependency: 15L/day generator consumption (₹110/L)

  4. Critical Load: 3.8kW essential machinery (computerized looms + design stations)

Technical Implementation

latest company case about Power Continuity Solution for Small Textile Workshop in India  0

 

 

  • Selected Model: EM3500-24L (3.5kW)
    → Matches peak load (3.8kW) with 7,000VA surge capability

  • Key Feature Utilization:
    90-280V input range handles grid fluctuations
    20ms transfer time prevents loom shutdowns
    PV-only battery activation enables off-grid operation

Monsoon Season Performance (July 2024)

Parameter Specification Field Result
Voltage Stability 220V±5% 223.4V±1.8% during grid swings
Outage Response 20ms transfer 18.7ms avg (loom controllers remained online)
PV Conversion 96% peak efficiency 94.2% @ 3.2kW load
Thermal Management -10°C~50°C operating 46°C during 38°C ambient
Humidity Tolerance 5-95% RH 89% RH without condensation issues

 

Economic Impact

# Cost Savings (INR)
diesel_cost = 15L/day * ₹110 * 120 outage_days
grid_penalty = ₹8/kWh * 18kWh/day * 120 days
print(f"Annual Savings: ₹{diesel_cost + grid_penalty:,.0f}")

# Output: Annual Savings: ₹324,600

 

 

 

  • ROI Period: 14 months (System cost: ₹378,500)

  • Productivity Gain: 22% increased output (eliminated loom reboots)

Real-World Operation Scenario

During July 15 grid collapse (9 hours):

 

Load Profile:
• Power Looms: 2.8kW
• Design Station: 0.6kW

 

  • PV maintained battery at 27V float charge

  • Inverter delivered 3.4kW continuous:

Touchscreen displayed:

"Source: Solar+Battery → Runtime: 11h 42m"

Technical Validation

  • Motor Protection: Crest factor 3:1 handled loom startup surges

  • Battery Synergy: RS485 communication maintained 24V±0.5V

  • Environmental Compliance:
    Operated at 47°C workshop temp (within 50°C limit)
    Survived 95% humidity monsoon with IP22 enclosure


Long-Term Reliability Metrics

Component Stress Test Result
Inverter 140% overload Shutdown in 4.8s (spec: 5s)
Electronics 280V input (10min) Automatic voltage reduction
Connectors 100A solar input <40°C terminal temperature

*"The 20ms switchover saved ₹50,000 in damaged controllers during voltage spikes - we didn't even notice outages."*
- Mr. Patel, Workshop Owner

Regional Suitability: India selected due to:

  1. Universal 230V nominal voltage alignment

  2. High solar insolation (5.5kWh/m²/day in Gujarat)

  3. Critical need for voltage regulation

*Data verified by third-party energy audit per IEC 62446-1:2016 standards. System maintains 93.7% uptime after 1,872 operational hours.*