Product Details
Place of Origin: China
Brand Name: 1stess
Certification: CE
Model Number: 540K2-200-200
Payment & Shipping Terms
Minimum Order Quantity: 1 piece
Price: consult
Packaging Details: container
Delivery Time: 45-60 days
Payment Terms: L/C,T/T
Application: |
Electric Car Charging |
EV Charging Point: |
Max 4 Points With 2 Dispensers |
EV Charging Power Transfer: |
Ring Net Powertransfer Between The 4 Charging Point |
EV Charging Voltage: |
150V-1000V |
BMS: |
2 Level BMS Structure: Battery Pack BSU+ High Voltage Control Box BMU |
Storage Capacity: |
200kWh |
Warranty: |
5 Years |
Application: |
Electric Car Charging |
EV Charging Point: |
Max 4 Points With 2 Dispensers |
EV Charging Power Transfer: |
Ring Net Powertransfer Between The 4 Charging Point |
EV Charging Voltage: |
150V-1000V |
BMS: |
2 Level BMS Structure: Battery Pack BSU+ High Voltage Control Box BMU |
Storage Capacity: |
200kWh |
Warranty: |
5 Years |
The 1stess Power Cube system coordinates EV charging, grid connection, and energy storage through an integrated Energy Management System (EMS). It is designed for commercial charging projects that need to manage grid draw and share power across multiple charging points.
| Model | 540K2-200-200 |
|---|---|
| EV charging voltage | 150–1,000 V DC |
| Maximum EV charging power | 360 kW, configuration dependent |
| Charging points | Up to 4 with 2 dispensers |
| AC input | 380/480 V AC, three-phase |
| Battery group capacity | 200 kWh per group, up to 2 groups |
| PV option | Up to 2 × 30 kW MPPT |
Specify the charger and dispenser configuration alongside the available grid input. The battery bank, PV input, and bidirectional functions depend on the selected power modules and project requirements.
Provide vehicle connector requirements, planned simultaneous sessions, site AC supply, and grid import limit for accurate system sizing.